The Reserve Components provide nearly half of total military end strength and receive less than 10 percent of defense procurement funding. The FY 2027 Defense Appropriations Act is Congress's opportunity to close the gap — beginning with the platforms the Total Force depends on most.
DoD Instruction 1225.06 requires the Reserve Components to be "consistently and predictably equipped" with the "right equipment, available in the right quantities, at the right time, and at the right place" to support a Train, Mobilize, and Deploy Total Force construct. The system does not deliver against that standard.
The current method for equipping the Reserve Components relies primarily on cascading — the redistribution of legacy systems from the Active Component as the active force modernizes. New procurement appropriations for the RC, including congressionally directed adds, account for less than ten percent of total defense procurement. The result is a Reserve force perpetually one or several generations behind on key platforms.
The FY 2027 President's Budget Request proposes $1.5 trillion in total budgetary resources — a 44 percent increase over the FY 2026 enacted level. ROA strongly supports funding national defense at no less than 5 percent of GDP. But topline growth alone does not guarantee proportional investment in the Reserve Components.
The pattern of prior defense buildups is consistent: Active Component platforms, personnel, and installations absorb the majority of topline increases while RC modernization timelines slip further behind force-flow requirements. ROA's FY 2027 priorities are the specific corrections needed to align resources with the operational reality of how the Reserve Components are being employed today.
Recapitalize the Reserve Component airlift and intra-theater refueling fleet across the Navy Reserve, Air Force Reserve, and Air National Guard.
Continue the modernization of the Army Reserve and Army National Guard High Mobility Multipurpose Wheeled Vehicle fleet — the Reserve's backbone ground mobility platform.
Field the F-15EX across Air National Guard and Air Force Reserve units replacing legacy F-15C/D and A-10 aircraft, and apply the FY 2025 divestiture-certification framework to RC fighter wings.
Resolve the KC-46A's Category 1 deficiencies, accelerate Remote Vision System 2.0 retrofit, and stabilize the tanker fleet on which every joint contingency depends.
All four platform priorities depend on the National Guard and Reserve Equipment Appropriation — the funding floor Congress sets each year for Reserve Component equipment modernization. See § 07 below.
The FY 2026 Defense Appropriations Act delivered $976 million for six C-130J aircraft for the Air National Guard and $500 million for four KC-130J aircraft for the Navy Reserve. ROA commends the Subcommittees for that investment — and notes that the FY 2027 P-1R triples the Navy Reserve request to 18 KC-130J aircraft, a historic generational recapitalization of the C/KC-130T fleet.
The unfunded recapitalization gap remains substantial: 48 legacy ANG and AFRC C-130H aircraft remain without a program of record; the 30-aircraft Navy Reserve C-130T logistics fleet continues to age; and 9 New York ANG LC-130H arctic aircraft require full recapitalization. The KC-130J is the Navy's only organic intra-theater airlift capability for oversized cargo — and the only platform capable of meeting every airlift requirement Distributed Maritime Operations demands.
The industrial base case is equally direct. The C-130J line supports 497 suppliers across 38 states, 33,563 direct and indirect jobs, and more than $3.9 billion in total economic impact. Production has declined from more than 24 aircraft per year in 2020 to approximately 20 today; only sustained congressional investment will prevent further decline. ROA endorsed the FY 2027 letter spearheaded by Rep. Barry Loudermilk and signed by 83 Members of Congress urging C-130J prioritization. The C-130J Multiyear Procurement III contract delivered approximately 11 percent in savings — roughly $580 million — relative to annual procurement, validating the case for a Multiyear Procurement IV beginning in FY 2028.
Despite the Army's affirmation of a requirement for more than 100,000 light tactical vehicles, HMMWV modernization funding for the Reserve Components was omitted from the President's FY 2027 budget request in line with broader Army Transformation Initiative direction. ROA's position is straightforward: omission from a budget request is not a substitute for an enduring force-design decision, and Congress has consistently added HMMWV modernization back in.
The operational case is acute. The Army Reserve's HMMWV fleet is aging rapidly, with significant portions of the inventory approaching or exceeding service life limits. Safety-related readiness failures — brake system degradation, steering component wear, electrical system failures — are occurring with increasing frequency. The Army Reserve is not programmed to receive the Common Tactical Truck until after 2032; the Bulk Fuel Distribution System is not programmed for complete fielding until 2031. The window between today and the next-generation fleet must be bridged by recapitalization.
The industrial base case is equally clear. More than 4,500 recapitalized HMMWVs are already in the Army National Guard as a direct result of sustained congressional investment. AM General — the manufacturer of both HMMWV and JLTV — employs more than 1,100 Americans at facilities in Indiana, Michigan, and Ohio, with a supplier base spanning all 48 contiguous states. Qualifying a replacement supplier takes a minimum of six to eight months; once production capacity is lost, it cannot be quickly or cheaply reconstituted. ROA thanks Rep. Rudy Yakym for his leadership of the bipartisan Light Tactical Vehicle letter and recognizes the increasingly difficult environment in which RC ground mobility modernization is being defended.
The F-15EX program has transitioned from a narrow F-15C/D replacement effort into the cornerstone of the Air Force's bridging strategy for fourth-generation combat aviation. The FY 2027 PBR requests $3 billion for 24 aircraft, with a planned total fleet of 267 — more than double the previous program of record. The Air National Guard is receiving the first F-15EXs at Portland ANGB, Oregon, with planned fielding at Fresno, New Orleans, and the Michigan ANG (replacing A-10s in Detroit). Basic F-15 training is shifting to Seymour Johnson AFB beginning in 2026.
ROA strongly supports full funding of the FY 2027 F-15EX request as a core element of Air National Guard and Air Force Reserve fighter recapitalization. The platform's payload capacity, electronic warfare suite (EPAWSS), range, and Open Mission System architecture make it the most relevant fourth-generation aircraft for homeland air sovereignty, theater air control, and stand-off strike — all missions in which the RC is heavily employed.
Just as important is the precedent the F-15EX program established for protecting Reserve Component force structure. The FY 2025 Defense Appropriations Act included a general provision prohibiting the divestiture of F-15 aircraft unless the Secretary of Defense certified to the Committees on Appropriations that any such aircraft would be replaced in a manner that maintained unit aircraft strength and preserved readiness. ROA respectfully urges the Subcommittees to apply that same framework to the 442nd Fighter Wing and other Reserve Component A-10 units that currently lack an identified follow-on mission, per Section 147(c) of the FY 2026 NDAA.
The KC-46A is the planned replacement for the legacy KC-135 Stratotanker fleet, with the Air Force currently programmed to procure 188 aircraft and considering an additional 75. Reserve Component fielding is central to the program: the 916th Air Refueling Wing (AFRC) at Seymour Johnson AFB received its first KC-46A in June 2020, and Air National Guard units at Pease ANGB (NH), Sumpter Smith JNGB (AL), and the planned 134th ARW at McGhee Tyson ANGB (TN) are scheduled to operate the platform as it replaces KC-135s across the force.
The challenge is execution. The KC-46A carries five active Category 1 deficiencies — the Pentagon's most serious problem designation. The most prominent is the Remote Vision System; the original RVS architecture has been replaced with RVS 2.0, which is now not expected to field service-wide until 2028 — roughly four years behind the original schedule. Boom stiffness limits the platform's compatibility with the A-10. Fuel system leaks, airframe cracks, and auxiliary power unit drain mast quality issues have all triggered delivery pauses. The aircraft's mission-capable rate stood at 61 percent in FY 2024, well below threshold.
The FY 2026 NDAA raised the tanker fleet minimum and required corrective action on KC-46 Category 1 deficiencies before further deliveries — a precedent ROA strongly supports. The FY 2026 NDAA also blocked KC-135 retirements, recognizing that the legacy tanker remains essential while the KC-46 program stabilizes. ROA urges the Subcommittees to sustain that posture, accelerate the RVS 2.0 retrofit, and ensure Reserve Component tanker units are not asked to absorb readiness risk on behalf of a program still working through fundamental design issues.
The National Guard and Reserve Equipment Appropriation is the single most important funding mechanism for Reserve Component equipment modernization. It is also, by long custom, an entirely congressional add — zeroed out in the President's budget and rebuilt each fiscal year by appropriators.
The FY 2027 PBR requests $1 billion for NGREA — a 25 percent increase over the FY 2026 enacted level of $800 million. ROA commends the Administration for the request. However, against a defense topline that grows by 44 percent, NGREA's share of the total budget falls to 0.067 percent — the lowest in modern history. A topline that surges while NGREA stagnates sends a clear signal that Reserve Component equipment modernization is not participating proportionally in the nation's defense investment.
During FYs 2018 through 2020, Congress funded NGREA at a median rate of 0.2059 percent of the total defense topline. Applied to the FY 2027 PBR of $1.5 trillion, that proportional rate would yield NGREA funding of approximately $3.09 billion. ROA is not asking for $3.09 billion. ROA is asking for $1.3 billion — less than half of what a truly proportional investment would demand, and consistent with the levels Congress provided in FYs 2018, 2019, and 2020.
| Fiscal Year | DoD Topline ($B) | NGREA ($B) | NGREA % of Topline |
|---|---|---|---|
| FY16 | 521.7 | 1.000 | 0.1918% |
| FY17 | 523.2 | 0.750 | 0.1434% |
| FY18 | 589.5 | 1.300 | 0.2206% |
| FY19 | 638.8 | 1.300 | 0.2035% |
| FY20 | 671.5 | 1.300 | 0.1936% |
| FY21 | 705.4 | 0.950 | 0.1347% |
| FY22 | 742.3 | 0.950 | 0.1280% |
| FY23 | 857.9 | 1.000 | 0.1166% |
| FY24 | 886.3 | 1.000 | 0.1129% |
| FY25 | 831.3 | 0.800 | 0.0962% |
| FY26 Enacted | 832.0 (base disc.) | 0.800 | 0.0962% |
| FY27 PBR | 1,500.0 (total) | 1.000 | 0.0667% |
| FY27 ROA Floor | 1,500.0 (total) | 1.300 | 0.0867% |
| FY27 Proportional | 1,500.0 (total) | 3.090 | 0.2059% |
Sources: FY 2027 PBR · FY 1999 – FY 2026 enacted appropriations · ROA Analysis
The Reserve Components generate $290 billion in annual savings. They deserve an appropriations process that invests commensurately in their readiness.ROA Statement to HAC-D & SAC-D · FY 2027 Appropriations Priorities